Revolutionizing AI and High-Performance Computing: A Groundbreaking Collaboration with Lingnan University

Background

A prestigious educational institution embarked on an ambitious project to revitalize its datacenter infrastructure, with the primary objective of creating a high-performance computing (HPC) environment that would facilitate the rapid growth of artificial intelligence (AI) applications and foster a culture of innovation. The initiative aimed to provide a robust and efficient framework for academic research, leveraging the latest advancements in datacenter design and technology.

Project Overview

The datacenter revamp project entailed a comprehensive overhaul of the existing infrastructure, incorporating a bespoke solution that would address the challenges of limited spatial capacity, inadequate cooling, high thermal output, and a stringent project timeline. By adopting a holistic approach, the institution sought to create a world-class HPC environment that would enable researchers to push the boundaries of knowledge and discovery.

Solution Highlights and Achievements

High-Density Cooling Solution: The datacenter features a sophisticated 40kW in-rack cooling system, precision-engineered for high-density applications and delivering optimized cooling performance directly within the racks.

Redundant Power Distribution: A highly reliable and redundant power distribution system ensures uninterrupted power supply to all computing resources, thereby minimizing downtime and maximizing productivity.

Advanced Data Centre Infrastructure Management (DCIM) System: The datacenter leverages a cutting-edge DCIM system, enabling real-time monitoring, analysis, and optimization of energy usage, computational performance, and system reliability.

Sustainable Datacenter Design: The project targeted a Power Usage Effectiveness (PUE) rating of down to 1.45, underscoring the institution’s commitment to environmental stewardship and sustainable practices.

Project Implementation

The project was completed in a remarkably short timeframe of just 3 months, demonstrating the institution’s ability to rapidly adapt to changing research needs. The 40kW in-rack cooling system was expertly integrated into 3 equipment racks, providing efficient cooling and optimizing outdoor unit installation. The redundant power distribution system and DCIM system were also implemented to ensure seamless and efficient operation.

Conclusion

The 40kW in-rack cooling solution and rapid 3-month deployment have enabled the institution to create a robust and scalable HPC environment, driving innovation and advancing research capabilities.